组件模板格式错误
Set as home page / Add to collection / 昆明理工大学主页
您当前所在的位置: Home -> Faculty and Staff -> Staff -> Department of Construction Management -> 正文

Mr. QIU Hong-da

发布日期:2019-08-25  来源:   点击量:

Mr. QIU Hong-da

Associate Professor

Email:175361047@qq.com

Academic Qualifications

1998.9-2001.7, Tsinghua University, Master of Architecture Economics and Management.

1980.9-1984.7, BEng, Wuhan Institute of Water Conservancy and Electric Power Engineering

Working Experience

1987 To date, Teaching Management Department of Architectural Engineering College of Kunming University of Science and Technology

Research Fields

1. Engineering Management

2. Project Costs

Academic Achievements

Papers:

[1] ZHANG Jin-jin;QIU Hong-da;SUN Ji-peng.plication of Multi-objective Decision Model in Reasonable Low Price Bid Evaluation.Value Engineering.2017

[2] SUN Ji-peng;QIU Hong-da;ZHANG Jin-jin.Ways to Ensure theProject Quality after the Compulsory Supervision System Reform.Value Engineering.2017

[3] GUO Zhe;QIU Hong-da.Dynamic Management and Control of Construction Cost.Chinese Market.2016

[4] SHI Yi-hui;QIU Hong-da.A Comparative Study on the Payment of Contract Price - Based on the Comparison between the 2013 Construction Contract (Construction Contract) and the FIDIC Construction Contract Conditions (1999 Edition).Chinese Market.2015

[5] QIU Hong-da;ZHANG Jian-ping. Interpretation of《construction project construction services subcontract (model text)》[J].Building economy.2014

[6] QIU Hong-da;YIN Shao-hong. Paying Attention to Construction Claim Management and Raising the Benefit of Construction Enterprise.China Construction Information.2004

[7] LI Shu-bin. How to deal with the bidding of bill of quantities for construction enterprises.China Construction Information.2004

[8] QIU Hong-da;YIN Shao-hong. Problems in Construction Supervision Industry in China.China Construction Information.2003

[9] QIU Hong-da;YIN Shao-hong. Problems and Countermeasures of Subcontract Management in Construction Engineering. Building economy.2014

[10] QIU Hong-da;YIN Shao-hong. The implementation of the lowest bid method, reduce the cost of government investment projects. China Construction Information.2003

[11] QIU Hong-da;YIN Shao-hong. After joining the WTO, improve the urgency of the quality of construction enterprises.China Construction Information.2003

[12] QIU Hong-da;YIN Shao-hong. How to Deal with China 's Engineering Supervision Industry after China' s Entry into..China Construction Information.2002

[13] QIU Hong-da;WANG Xiao-min. Problems in Planning and Construction of Villages in the Suburbs. Urban and rural construction.2001

Books Involved:

[1] Project valuation

[2] Civil engineering construction

Patent:

[2] Method of Reducing Iron Concentrate and Manganese Chemical Products.

[2] Reduced magnetization of poor hematite.

上一条:Mr. YAN Wei

下一条:Miss SUN Yu-mei

昆明理工大学建筑工程学院Copyright 2014
滇ICP备1200409-9号 地址:昆明市昆明理工大学呈贡校区建筑工程学院 联系方式:0871-65916810